LONDON – CHEESE MANUFACTURE SUPPLY UPGRADE
Way back in 2014 D-Tech Electrical Contractors were tasked with a supply upgrade from the current 630a to 800a. This consisted of a floor mounted panel board extension to suit the existing. Disconnection of the existing 300mm 4-core SWA and a new parallel 240mm 4-core SWA supply across a distance of 110m through an extremely difficult roof void. All works was carried out with no disruption to production with the changeover of supply being carried out outside of production hours at night.
Are you interested?
D-Tech Electrical can manage any jobs UK wide for business small & large. Get in contact with us by using the button below.